Hardee Farms

Abstract

Hardee Farms is a single family residential community which began construction in 2012.  Phase One of this project consists of 121 lots, several open and community area for recreation, perimeter wooded areas, and fencing for aesthetics and privacy, and sidewalks for walking throughout.

Stormwater Design

Stormwater from this project is transported by a combination of curb and gutter systems and subsurface storm drainage pipe.  All stormwater for the project travels through one of the three wet detention basins constructed throughout the site.  

Wastewater Design

All sewer wastewater for this site is transported offsite to the neighboring subdivision pump station by means of gravity piping networks.  This was possible due to the depth of the existing facility.  All sewer mains are laid within roadway rights of way.

Water Design

Over 5,000 linear feet of water lines were designed  to accommodate the lots of Hardee Farms.  An existing municipality water line was tied onto in two  locations  while valving was arranged to accommodate project phasing.

Section A Sketch

 

 

             

          Project Photos

 

Grading

 

EC

 

Grading

 

Pond